Projects in Croatia · focus on Dalmatia Advisory in German, English and Croatian
Projects

Completed projects, before and after

Five projects from construction, refurbishment and site management — each with the condition beforehand and the result. The photographs come from the sites themselves, not from a stock library.

New build in Dalmatia

Service New build, site supervisionLocation DalmatiaYear 2025–2026

A two-storey new build on a slope, looking out over olive groves to the sea. Natural stone cladding at the base, cast stone balustrade, fully fitted inside with kitchen and bathrooms.

The new build from outside: a two-storey house with a tiled roof, a balustraded balcony and Mediterranean planting.
Terrace with a stone balustrade, looking over olive groves to the sea and the islands beyond.
External stair with natural stone cladding and a white balustrade against the facade.
Finished bathroom with a level-access shower, washbasin and two windows.
Fitted kitchen run with a stone worktop, oven and extractor hood.

Bathroom: from dated fittings to a level-access shower

Service Full bathroom refurbishmentYear 2019

The original bathroom had a cramped shower cubicle and tiling from the time of construction. It was replaced by a level-access shower with a rain head, large-format tiles and a glass screen.

The old bathroom before refurbishment: pale blue wall tiles, a cramped shower cubicle, a wooden door.Before
The refurbished bathroom: a level-access shower with a rain head and large-format stone-effect tiles.After
The refurbished bathroom with washbasin, mirror and a glass screen to the shower.After
A view into the finished shower with its glass wall and wall shelf.After

Water damage: mould out, bathroom rebuilt

Service Reinstatement after water damageYear 2025

Mould had been growing behind the bath and the stud wall for months. Strip-out back to the shell, drying, new services and a new build-up — documented from the damage to the finished surfaces.

Water damage in the bathroom: the bath torn out, the wall chased open, mould on the masonry.Before
The washbasin removed and the stud wall opened up after the water damage.Before
Extensive mould growth on the wall behind the tiling.Before
The reinstated bathroom with a new vanity unit, WC and new tiling.After
The newly tiled room during installation of the sanitary fittings.After
The new bath with timber panelling against the freshly tiled wall.After

House: facade, roof and balcony

Service Facade, roof, balcony

Weathered render, an old roof and a timber balcony railing. After the work: a new roof covering, a solid balustrade, a natural stone base and a newly laid out garden.

The house before the work: weathered render, an old timber balcony railing, an old roof.Before
The renovated house with a new tiled roof, a white balustrade and a planted garden.After
The ground floor after the work, with a natural stone base, a new terrace and the balcony above.After

Slope retention on bored piles

Service Slope retention, 35 × 3.5 mYear 2013

A decayed timber palisade was no longer holding the slope above the road. It was replaced by a fair-faced concrete wall 35 metres long and 3.5 metres high on a bored pile foundation.

The slope before the work: a decayed timber palisade and overgrown ground.01
Building the foundation: a concrete mixer and pump on site, formwork along the slope.02
The finished retaining wall in fair-faced concrete along the road, 35 metres long.03
Next step

Your project on this list?

Describe the property and your objective. We will tell you which trades are needed and in what order.